1.1. Removal Procedure
2.1. Installation Procedure

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
8S-2264  Puller Group 
ZZ  6V-9509  Face Seal Plug 
6V-9830 Cap As 
6V-9508 Face Seal Plug 
6V-9829 Cap As 

Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will help to prevent dirt from entering the internal mechanism.

Note: SERVICE DATA: TOOLING (ZZ) WILL NOT BE IDENTIFIED IN PHOTOGRAPHS IN THE REMOVAL OR THE INSTALLATION. THIS TOOLING IS SHOWN IN ORDER TO ASSIST THE EXPERIENCED SERVICEMAN.


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, PERJ1017, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products.

Dispose of all fluids according to local regulations and mandates.


------ WARNING! ------

Personal injury can result from hydraulic oil pressure and hot oil.

Hydraulic oil pressure can remain in the hydraulic system after the engine has been stopped. Serious injury can be caused if this pressure is not released before any service is done on the hydraulic system.

Make sure all of the work tools have been lowered to the ground, and the oil is cool before removing any components or lines. Remove the oil filler cap only when the engine is stopped, and the filler cap is cool enough to touch with your bare hand.


Note: Put identification marks on all lines, on all hoses, on all wires, and on all tubes for installation purposes. Plug all lines, hoses, and tubes. This helps to prevent fluid loss and this helps to keep contaminants from entering the system.

  1. Turn the battery disconnect switch to the OFF. Refer to Operation and Maintenance Manual, SEBU7477, "Battery Disconnect Switch" for the correct procedure.

  2. Release the hydraulic pressure in the hydraulic system. Refer to Disassembly and Assembly Manual, "Machine preparation for Disassembly and Assembly" for the correct procedure.


    Illustration 1g00930955

    ------ WARNING! ------

    Personal injury can result from being struck by parts propelled by a released spring force.

    Make sure to wear all necessary protective equipment.

    Follow the recommended procedure and use all recommended tooling to release the spring force.


  3. Remove button (1). Remove spring (2) and nut (3). Remove pins (4).


    Illustration 2g00930961

  4. Remove wheel (5) with Tooling (A).


    Illustration 3g00930965

  5. Remove screws (6). Remove knob (7) and remove cover (8).


    Illustration 4g00930970

  6. Disconnect six harness assemblies (9). Disconnect five wires (10).


    Illustration 5g00930972

  7. Remove screws (11) and remove cover (12).


    Illustration 6g00930993

  8. Carefully remove insulator (13) from shaft (14). Remove ring (15). Remove brushes (16) and springs (17). Remove bracket (18). Slide retainer (19) off shaft (14).


    Illustration 7g00930997

  9. Remove cover (20A). Remove five hoses (20). Remove bolts (21) and remove the rear section of metering pump (22). Remove the front section of metering (23).

Installation Procedure

Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement.



    Illustration 8g00930997

  1. Install the front section of metering (23). Install the rear section of metering pump (22). Install bolts (21). Install five hoses (20). Install cover (20A).


    Illustration 9g00930993

  2. Slide retainer (19) on shaft (14). Install bracket (18). Install brushes (16) and springs (17). Install ring (15). Carefully install insulator (13) on shaft (14).


    Illustration 10g00930972

  3. Install cover (12) and install screws (11) .


    Illustration 11g00930970

  4. Connect six harness assemblies (9). Connect five wires (10).


    Illustration 12g00930965

  5. Install cover (8) and install knob (7). Install screws (6).

  6. Install wheel (5).


    Illustration 13g00930955

    ------ WARNING! ------

    Personal injury can result from being struck by parts propelled by a released spring force.

    Make sure to wear all necessary protective equipment.

    Follow the recommended procedure and use all recommended tooling to release the spring force.


  7. Install pins (4). Install spring (2) and nut (3). Tighten nut (3) to a torque of 67 ± 7 N·m (49 ± 51 lb ft). Remove button (1).

  8. Turn the battery disconnect switch to the ON. Refer to Operation and Maintenance Manual, SEBU7477, "Battery Disconnect Switch" for the correct procedure.

  9. Check the hydraulic oil level. Refer to Operation and Maintenance Manual, SEBU7477, "Hydraulic System Oil Level - Check" for the correct procedure.

Information System:

M318C and M322C Excavators Machine Systems Hydraulic Hand Control - Install - Stabilizer and Blade
M318C Excavator Machine Systems Hydraulic Hand Control - Remove - Stabilizer and Blade
AP-1000D, AP-1055D, AP-655C, BG-2255C, BG-2455D and BG-260D Asphalt Pavers MID 039 - CID 1763 - FMI 02
CS-563E, CP-563E, CS-573E, CP-573E, CS-583E, CP-583E, CS-663E, CP-663E and CS-683E Vibratory Soil Compactors Engine Oil and Filter - Change
3512 and 3516 EUI Engines for 784B, 785B, 789B and 793B Off-Highway Trucks Engine Overspeed Lamp and Engine Overspeed Alarm
CS-563E, CP-563E, CS-573E, CP-573E, CS-583E, CP-583E, CS-663E, CP-663E and CS-683E Vibratory Soil Compactors Engine Oil Sample - Obtain
CS-563E, CP-563E, CS-573E, CP-573E, CS-583E, CP-583E, CS-663E, CP-663E and CS-683E Vibratory Soil Compactors Engine Oil Level - Check
3054E Industrial Engine Engine Valve Lash - Inspect/Adjust
R2900 Load Haul Dump Belts - Inspect/Adjust
3054E Industrial Engine Glow Plugs - Test
CB-434D, CB-534D, CB-534D Series XW and CB-564D Paving Compactors Power Supply Circuit of Electronic Control Module
14H Motor Grader Machine Systems Piston Pump (Hydraulic and Steering) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Hydraulic System Main Control Valve - IT38G Series II Integrated Toolcarrier
AP-1000D, AP-1055D, AP-655C, BG-2255C, BG-2455D and BG-260D Asphalt Pavers MID 039 - CID 0972 - FMI 02
3126B Machine Engines Sensors and Electrical Connectors
R2900 Load Haul Dump Maintenance Interval Schedule
Installation Instructions for the Machine Security System on the Medium Wheel Loaders{7631}
CB-634D Paving Compactor Machine Electronic Control System Reverse Propel
AP-1000D, AP-1055D, AP-655C, BG-2255C, BG-2455D and BG-260D Asphalt Pavers MID 039 - CID 0973 - FMI 02
3054E Industrial Engine Alternator - Test
C4.4 (Mech) Industrial Engine Fuel Injection Nozzle - Test
C4.4 (Mech) Industrial Engine Engine Oil Cooler - Inspect
3054E Industrial Engine Power Sources
AP-1000D, AP-1055D, AP-655C, BG-2255C, BG-2455D and BG-260D Asphalt Pavers MID 039 - CID 0974 - FMI 02