MACHINE ARRANGEMENT
1.1. Changing The Hydraulic Oil
2.1. Changing The Oil In The Ground Drive Transmission
- 1. Change the hydraulic oil in the hydraulic oil tank.
- 2. Change the oil in the ground drive transmission.
Changing The Hydraulic Oil
HYDRAULIC OIL TANK
When changing the hydraulic oil, cleanliness must be kept in mind at all times. Perform the work in a clean area, use clean tools, keep your hands clean and clean up the outside of the hydraulic oil tank before starting.
Show/hide table
THE HYDRAULIC OIL AT OPERATING TEMPERATURE CAN CAUSE SERIOUS BURNS. LET THE MACHINE STAND IDLE UNTIL THE OIL HAS COOLED AND THE TANK IS COMFORTABLE TO TOUCH. |
- 1. Remove the drain plug from the bottom of the tank and allow the oil to drain.
- 2. Pour a small amount of clean hydraulic oil into the tank to clean out the bottom of the tank.
- 3. Install the drain plug.
- 4. Fill the tank with clean hydraulic oil meeting the specification on page 3-1.
- 5. Change the ground drive suction and auxiliary return filter elements (see page 3-24).
Changing The Oil In The Ground Drive Transmission
Show/hide table
HOT OIL OR COMPONENTS CAN CAUSE BURNS IF THEY CONTACT SKIN. USE CAUTION WHEN DRAINING OIL OR CHANGING FILTERS. ALLOW THE MACHINE TO STAND IDLE UNTIL THE TRANSMISSION CASE IS COOL ENOUGH TO TOUCH WITH YOUR HAND. |
- 1. Place a suitable container beneath the transmission. The transmission holds approximately 3 quarts (2.8 L) of oil.
- 2. Remove the drain plug and allow the oil to drain.
- 3. Replace the drain plug.
- 4. Fill the transmission with lubricant meeting the specification on page 3-2.
Information System:
SS-250 SOIL STABILIZER
250 Hour Service
SS-250 SOIL STABILIZER
50 Hour Service
SS-250 SOIL STABILIZER
Daily Or 10 Hour Service
SS-250 SOIL STABILIZER
Service Data
SS-250 SOIL STABILIZER
Starting Operation
SS-250 SOIL STABILIZER
Starting Procedure
SS-250 SOIL STABILIZER
Operation
AP-800 ASPHALT PAVER
1000 Hour Or Annual Service
AP-800 ASPHALT PAVER
500 Hour Service
AP-800 ASPHALT PAVER
250 Hour Service
AP-800 ASPHALT PAVER
50 Hour Service
AP-800 ASPHALT PAVER
Daily Or 10 Hour Service
SS-250 SOIL STABILIZER
2000 Hour Service
RR-250 ROAD RECLAIMER
Safety
RR-250 ROAD RECLAIMER
Operation
RR-250 ROAD RECLAIMER
Starting Procedure
RR-250 ROAD RECLAIMER
Starting Operation
RR-250 ROAD RECLAIMER
Adjusting The Cutting Depth
RR-250 ROAD RECLAIMER
Service Data
RR-250 ROAD RECLAIMER
Daily Or 10 Hour Service
RR-250 ROAD RECLAIMER
50 Hour Service
RR-250 ROAD RECLAIMER
250 Hour Service
RR-250 ROAD RECLAIMER
500 Hour Service
RR-250 ROAD RECLAIMER
2000 Hour Service